Stormwater Plan Review

Contact Us

Stormwater Plan Submittal Requirements

A stormwater plan covers the design, construction, and maintenance of stormwater practices on the site including stormwater control measures (SCMs). Stormwater management approvals are reviewed by the Stormwater Program Manager or designee and may be reviewed concurrently with the City of Statesville Planning Department Technical Review Committee (TRC) review and approval process.

Development and redevelopment projects require a stormwater management plan if they cumulatively disturb one acre or more or add 20,000 square feet or more of BUA. The stormwater management plan requirement also applies to projects that are part of a larger common plan of development or sale that, in total, disturb one acre or more or add 20,000 square feet or more of BUA. For redevelopment projects, increased stormwater controls are required only for the amount of BUA being created that exceeds the pre-existing BUA.

The Stormwater Ordinance and the City of Statesville Drainage Design Manual detail the process and what is required to be submitted for complete applications for review.  The Concept Plan Application-Form A and Stormwater Plan Application-Form B have checklists of items required for submittal.

Stormwater Plan Review

  • $500 per project + $100 per acre of disturbance*

Revision to Approved Plans

  • $500 per project + $100 per acre of disturbance*

Stormwater Plan Review-More Than Two (2) Reviews

  • $500 per project*

*Includes two (2) reviews

If no revisions are required between grading only and full construction, then no additional stormwater review fees are required.

Stormwater Regulations, Standards & Policies

*Click on the appropriate link below for additional details

CLICK Link Below:Description:

Statesville Stormwater Ordinance

Ordinance amending the Unified Development Code, Appendix A, Article 8, Section 8.05 Stormwater Management & Article 6 Development Standards, Sections 6.04 Landscape Standards, E. Grading Standards for stream and wetland protection.

Illicit Discharge & Illicit Connection Ordinance 17-20

Ordinance amending Chapter 20 of the Statesville City Code

Drainage Design Manual

City of Statesville Drainage Design Manual. Effective April 20, 2026

Floodplain Development Regulations - Section 2.25

Section 2.25 Floodplain Development Permit

Concept Plan - Form A

Stormwater Concept Plan Application

Stormwater Plan Application – Form B

Stormwater Management Plan Application

Stormwater Final Inspection – Form C

Stormwater Final Inspection Checklist

As-built Certification – Form D

Engineer should verify with the Stormwater Program Manager that the project is cleared for acceptance of as-built submittals before completing this form and sending attachments.

SCM Operation & Maintenance Agreement – Form E

Stormwater Control Measure(s) Operation & Maintenance (O&M) Agreement
Bond Estimate - Stormwater Control MeasuresPlease email Randall Moore, Stormwater Program Manager to request the Bond Estimate - Stormwater Control Measures form.

Installation Performance Security – Surety Bond

Stormwater Installation Performance Security Bond

Installation Performance Security – Letter of Credit

Stormwater Management Plan Irrevocable Bank Letter of Credit Form
Floodplain Development ApplicationCity of Statesville Floodplain Development Application.
NC Department of Environmental Quality - Stormwater Design Manual

This document lists all SCM credits together to facilitate comparisons between different SCMs for the regulated community and includes information on the New Stormwater Technology (NEST) Program. It is a joint effort between DEQ’s Stormwater and Nonpoint Source Planning programs.

Links to Additional AgenciesLinks to other pertinent permitting agencies.


Upcoming City Events:

Displaying 39 Events:
Car Seat Check
Jun 29, 2026
3:00 PM EDT
779 Eastside Drive
Statesville, NC 28625
Read More 
2026 Fireworks Celebration
Jul 03, 2026
9:30 PM EDT
Statesville, NC
Read More 
Pickleball 101: Learn to Play at the Statesville Recreat...
Jul 06, 2026
4:00 PM EDT
911 Lakewood Dr.
Statesville, NC 28677
Read More 

Latest News from the Stormwater Division:

UPDATE: Culvert Replacement Project – Water Outage Sched... UPDATE: Culvert Replacement Project – Water Outage Scheduled for March 27
Iredell Rowan HMP Draft Review In order to enhance community resilience and improve natural hazard response, Iredell and Rowan County are currently in the process of u...
Help Protect Our Waterways: Volunteer to Mark Storm Drai... The Stormwater Division is excited to offer a new volunteer opportunity for citizens who want to make a difference in their community. Y...

Read More