A stormwater plan covers the design, construction, and maintenance of stormwater practices on the site including stormwater control measures (SCMs). Stormwater management approvals are reviewed by the Stormwater Program Manager or designee and may be reviewed concurrently with the City of Statesville Planning Department Technical Review Committee (TRC) review and approval process.
Development and redevelopment projects require a stormwater management plan if they cumulatively disturb one acre or more or add 20,000 square feet or more of BUA. The stormwater management plan requirement also applies to projects that are part of a larger common plan of development or sale that, in total, disturb one acre or more or add 20,000 square feet or more of BUA. For redevelopment projects, increased stormwater controls are required only for the amount of BUA being created that exceeds the pre-existing BUA.
The Stormwater Ordinance and the City of Statesville Drainage Design Manual detail the process and what is required to be submitted for complete applications for review. The Concept Plan Application-Form A and Stormwater Plan Application-Form B have checklists of items required for submittal.
Stormwater Plan Review
Revision to Approved Plans
Stormwater Plan Review-More Than Two (2) Reviews
*Includes two (2) reviews
If no revisions are required between grading only and full construction, then no additional stormwater review fees are required.
*Click on the appropriate link below for additional details
| CLICK Link Below: | Description: |
Ordinance amending the Unified Development Code, Appendix A, Article 8, Section 8.05 Stormwater Management & Article 6 Development Standards, Sections 6.04 Landscape Standards, E. Grading Standards for stream and wetland protection. | |
| Illicit Discharge & Illicit Connection Ordinance 17-20 | Ordinance amending Chapter 20 of the Statesville City Code |
City of Statesville Drainage Design Manual. Effective April 20, 2026 | |
| Floodplain Development Regulations - Section 2.25 | Section 2.25 Floodplain Development Permit |
| Stormwater Concept Plan Application | |
| Stormwater Management Plan Application | |
| Stormwater Final Inspection Checklist | |
Engineer should verify with the Stormwater Program Manager that the project is cleared for acceptance of as-built submittals before completing this form and sending attachments. | |
| Stormwater Control Measure(s) Operation & Maintenance (O&M) Agreement | |
| Bond Estimate - Stormwater Control Measures | Please email Randall Moore, Stormwater Program Manager to request the Bond Estimate - Stormwater Control Measures form. |
| Stormwater Installation Performance Security Bond | |
| Stormwater Management Plan Irrevocable Bank Letter of Credit Form | |
| Floodplain Development Application | City of Statesville Floodplain Development Application. |
| NC Department of Environmental Quality - Stormwater Design Manual | This document lists all SCM credits together to facilitate comparisons between different SCMs for the regulated community and includes information on the New Stormwater Technology (NEST) Program. It is a joint effort between DEQ’s Stormwater and Nonpoint Source Planning programs. |
| Links to Additional Agencies | Links to other pertinent permitting agencies. |