Stormwater Plan Submittal Requirements

Stormwater Management approvals are issued as part of the City of Statesville Planning Department Technical Review Committee processes and procedures.

Before a stormwater management permit application is deemed complete, the developer shall schedule a consultation with the Stormwater Program Manager on a concept plan for the post-construction stormwater management system to be utilized in the proposed development project. This consultation meeting may be done as part of a Planning Department/TRC Pre-Application Conference. The purpose of this meeting is to discuss the post-construction stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities, and potential approaches to stormwater management designs before formal site design engineering is commenced. Local watershed plans, the Unified Development Ordinance, and other relevant resource protection plans should be consulted in the discussion of the concept plan.

The stormwater management plan submitted for TRC approval shall detail how post-development stormwater runoff will be controlled and managed and how the proposed project will meet the standards requirements of the Statesville UDO. Plans should include clear delineations and accounting for all existing and proposed impervious areas, specifying areas to be removed and any additional impervious areas requiring stormwater treatment.

Any changes to the plans made subsequent to TRC approval (which affect the storm drainage conveyance and/or any SCMs) must be re-submitted to the City of Statesville for approval of the changes.

Documents required at submittal include (but are not limited to) are site plans, calculations, Stormwater Application and Checklist, Letter of Approval for E&SC, NCG01 Certificate of Coverage, and any 401/404 permits.

Stormwater Regulations, Standards & Policies

*Click on the appropriate link below for additional details

CLICK Link Below:Description:
Statesville Stormwater Ordinance 13-19

An ordinance amending the Unified Development Code, Article 8 Public Facility Requirements, Section 8.02 Stormwater Management & Sections 8.02, 8.03 and Article 10 Appendicies.

Illicit Discharge & Illicit Connection Ordinance 17-20

An ordinance amending Chapter 20 of the Statesville City Code.

Drainage Design Manual

City of Statesville Drainage Design Manual. Effective July 1, 2019.

Floodplain Development Regulations - Section 2.25

Section 2.25 Floodplain Development Permit.

Stormwater Plan Submittal RequirementsStormwater Management approvals are issued as part of the City of Statesville Planning Department Technical Review Committee processes and procedures.
Concept Plan - Form AStormwater Application - Concept Plan
Application - Stormwater Management - Form BStormwater Application - Stormwater Management Plan
Final Inspection Checklist - Form CStormwater Final Inspection Checklist.
Engineer SCM As-Built Certification - Form DEngineer SCM As-Built Certification.
SCM Operation & Maintenance Agreement - Form ESCM Operation & Maintenance Agreement.
Bond Estimate - Stormwater Control MeasuresPlease email Randal Moore, Stormwater Program Manager to request the Bond Estimate - Stormwater Control Measures form.
Installation Performance Security BondStormwater Installation Performance Security Bond.
Performance Security Letter of CreditStormwater Management Plan Irrevocable Bank Letter of Credit.
Performance Security Maintenance BondStormwater Performance Security Maintenance Bond ("Bond").
Floodplain Development Application & No-Rise CertificateCity of Statesville Floodplain Development Application.


Upcoming City Events:

Displaying 34 Events:
Blood Drive with the American Red Cross
Jun 06, 2024
9:00 AM EST
1875 Simonton Rd
Statesville, NC 28677
Read More 
Splash-In Movies: Teenage Mutant Ninja Turtles: Mutant M...
Jun 15, 2024
7:30 PM EDT
1410 3rd St.
Statesville, NC 28677
Read More 
District 2 & District 3 Community Meeting
Jun 20, 2024
5:00 PM EDT
1410 3rd St.
Statesville, NC 28677
Read More 

Latest News from the Stormwater Division:

Stormwater Repair on Brevard StreetOn Monday October 17th, City Stormwater Staff will be closing Brevard Street between 1st Avenue and Stockton Street in order to replace ...
Stormwater Hurricane PreparednessCheck the storm drains in your neighborhood. Any debris on top of the drains can result in flooding.
South Meeting Street Culvert Replacement ProjectThe Capital Improvement Project - South Meeting Street Culvert Replacement, will begin the week of August 22, 2022.

Read More